Switching your schedule to takt mode

Video walkthrough for this article has not been recorded yet — the written steps above are the full guide in the meantime.

Jig doesn't have a separate takt-planning module — takt is a mode on your existing Schedule tab. A project left in its default CPM mode works like an ordinary critical-path schedule. Switching a project to takt mode adds zones, a repeating trade sequence with each trade's crew capacity, a calculated takt time per zone, and a flow-line chart as your main view.

Two things worth knowing before you switch: